What porta potty setup does a rebuild lot need?
Most rebuild crews are under 20 workers, so 1 standard unit with weekly service meets the Cal/OSHA 8 CCR 1526 count. Add a handwashing station when several trades work at once, and a second unit when the crew passes 20.
Where should the unit go on a sloped lot?
Set the unit on the flattest reachable spot near the street, usually next to the driveway cut or the material pad. Never set it on a slope that could tip. Keep it out of the way of the foundation pour, the septic install and concrete trucks.
How does winter affect ridge jobsites?
Paradise sits around 1,700–2,000 feet and Magalia around 2,300 feet. Winter brings heavy rain and some snow. Keep a gravel pad by the street for the unit, and expect a service visit to shift a day after big storms.
How do builders with several lots save time?
Builders with several Paradise and Magalia lots keep every unit on one account, one invoice per 28-day cycle, and one weekly route day. Units start at $165 per 28 days with weekly service, plus a one-time $65 delivery fee per order.
Questions
Can the unit move from the foundation stage to the framing stage?
The unit can be moved on the same lot during a weekly service at no charge.
How fast can a unit get to a Paradise rebuild lot?
Paradise is about 25 minutes up Pentz Road from our Oroville yard. Call by noon, Monday to Saturday, and a jobsite unit usually reaches the lot that afternoon.